The Finishing Touches Before Listing Your PadSplit

How should I stress test the property?

Last updated May 31, 2021

We recommend conducting a stress test to check to see if your property is ready to be occupied by PadSplit Members:

 

Plumbing

  • Run showers and sinks for 10 minutes to ensure water runs both cold and hot and all drainage works properly
  • Plug and fill tubs then let the tub drain. The tub should drain completely in less than 5 minutes
  • Flush the toilet 10 times to check for any back-ups
  • Check the handle of each toilet and plumbing fixture to ensure that it is installed tightly and does not move

 

Electrical

  • Test to make sure that every outlet functions
  • Test every GCFI outlet with a tester
  • Turn on all lights to check for flickering

 

Safety

  • Test every smoke detector
  • Test every interior and exterior lock to make sure it functions

 

Structural 

  • Open and close every door ensuring that each sits correctly in its frame 
  • Open and close all cabinets 
  • Lean your full body-weight on all railings to ensure their stability 

 

Appliances/HVAC

  • Turn on the stove to test for heat 
  • Turn on the oven for 10 minutes to check for smoke 
  • Test the dryer for 10 minutes to ensure functionality 
  • Run the air conditioning and heat for 10 minutes each, making sure that air filters are present in the system 

 

Keep in mind that no system is completely foolproof. However, passing these tests reduces the risk of you facing costly maintenance bills after opening the property.